Palu 3 – Indonesia

Thermal fired power plant

  russia

Palu 3 Project Abstract

The Pilsen steam turbine manufacturer will supply two 50MW steam turbines, including other parts of additional technology and equipment, for one of the most modern power generating plant in Indonesia. Deliveries to the construction site will take place in mid-2021 and will be followed by assembly work under expert supervision of Doosan Škoda Power. The first steam is expected to be invited to the turbines in 2023. The Palu 3 power plant will be one of the most advanced technology in Indonesia. Circulating fluidized bed boilers have been chosen as the source of steam. The new boilers will be installed in a block with two 50MW DST-G20 steam turbines with accessories. In addition to supplying the steam turbines, Doosan Škoda Power is providing a synchronous generator, oil system, control system and other equipment, including a design for the turbine pedestal and coordination of the applicable part of the project. The Palu 3 power plant project follows on other successful Doosan Škoda Power projects at the Grati, Grati 2 and Muara Tawar power plants in Indonesia.

Flenco’s presence in the Project

Flenco is pleased to have been selected as preferred partner by Doosan Skoda Power s.r.o. to supply its auxiliary systems for this project. For further inquiries about this collaboration, you can ask your usual contact person at our Sales Department or complete and send us our contact form.

Source:www.doosanskodapower.com

main projects