Summit Meghnaghat II – Bangladesh

Combined cycle gas power plant 583 MW

  russia

Summit Meghnaghat II Project Abstract

DHAKA, BANGLADESH, March 18, 2019: Adhering to their commitment to provide reliable and affordable electricity in Bangladesh, Summit and GE Power (NYSE: GE) announced they will proceed with the co-development of Summit Meghnaghat II, a 583 MW combined cycle gas power plant at Meghnaghat, near Dhaka, Bangladesh. GE Power will be providing the turnkey solution for the Summit Meghnaghat II power project, and is responsible for the design of the facility, supply and installation of the equipment and commissioning works. The equipment being provided by GE includes one 9HA.01 gas turbine, one heat recovery steam generator (HRSG), one steam turbine generator, condenser and associated systems, as well as balance of plant (BOP) solutions. Additionally, GE will provide services including the maintenance and repairs of the power generation equipment at the facility for a period of 20 years, helping to sustain the efficiency, reliability, performance and availability of the plant. Summit is amongst the largest independent power producers (IPP) in Bangladesh, generating close to 2 gigawatts (GW) for the national grid.

Flenco’s presence in the Project

Flenco is pleased to have been selected as preferred partner by GE Global Parts and Products Gmbh to supply its auxiliary systems for this project. For further inquiries about this collaboration, you can ask your usual contact person at our Sales Department or complete and send us our contact form.

Source:www.genewsroom.com

main projects