Tambak Lorok Block 3 - Indonesia

Combined-cycle power plant 780MW

  russia

Tambak Lorok Block 3 Project Abstract

JAKARTA, INDONESIA—JULY 19, 2017— Indonesia Power(IP), a wholly owned subsidiary of PT. PLN (Persero) (“PLN”), announced today that it has awarded General Electric (GE), Marubeni Corporation (“Marubeni”) and PT. Hutama Karya (“HK”) consortium an EPC (Engineering, Procurement and Construction) contract for the Tambak Lorok Combined Cycle Power Plant Block 3 Project (“Tambak Lorok”). The power plant, which will commence operation in mid 2020, is expected to add approximately 780 MW of electricity to the Indonesia grid, equivalent power needed to supply up to five million Indonesian homes. In addition, Tambak Lorok will be the largest power project developed in IP’s history and one of the first in the region to use GE’s latest HA gas turbine technology. Tambak Lorok will be powered by GE’s largest and most efficient gas turbine, the 9HA.02, as well as GE’s D650 steam turbine, heat recovery steam generator (HRSG) and balance of plant equipment. The plant will be delivered in a turnkey combined cycle configuration using GE’s extended scope technology, allowing Indonesia Power to start commercial operation faster and simpler than earlier power plant designs.

Flenco’s presence in the Project

Flenco is pleased to have been selected as preferred partner by Ge Energy to supply its auxiliary systems for this project. For further inquiries about this collaboration, you can ask your usual contact person at our Sales Department or complete and send us our contact form.

Source:www.genewsroom.com

main projects