Bhola II - Bangladesh

Dual-fuel combined-cycle power plant 220MW

  russia

Bhola II Project Abstract

Dhaka, Bangladesh – September 13, 2017 – GE (NYSE: GE) today announced that it has been selected by the Shapoorji Pallonji Group (SP Group) to supply the power generation equipment for the upcoming 220 megawatt (MW) combined cycle power plant in the Bhola district of Bangladesh. This will be GE’s second power plant in Bhola of the same capacity with the first being commissioned in 2015. The power plant will operate on duel-fuel technology using natural gas as the primary fuel and diesel as the back-up fuel and is expected to achieve commercial operations by December 2019. The project will result in supplying the equivalent power needed to provide electricity to 200,000 homes in Bangladesh. GE Power will supply the full suite of engineered equipment package (EEP) for the project, including two 6F.03 gas turbines, two heat recovery steam generators (HRSG), one steam turbine generator, condenser and associated control systems. GE will also provide technical expertise during the installation phase of the project. Once completed, Bhola power plant will be the fleet leader for GE’s heavy duty 6F.03 gas turbine with advance gas path, delivering higher levels of efficiency, flexibility and reliability typically only seen in large capacity power plants.

Flenco’s presence in the Project

Flenco is pleased to have been selected as preferred partner by Ge Energy to supply its auxiliary systems for this project. For further inquiries about this collaboration, you can ask your usual contact person at our Sales Department or complete and send us our contact form.

Source: www.genewsroom.com

main projects